~Hopewell Facilities~

 Master Site Development Plan 

2002 - 2012 

February 2002 DRAFT

- Chapter 1 - Chapter 2 - Chapter 3 - Chapter 4 - Chapter 5 - Chapter 6 - List of Maps - Appendices

Chapter 1 - Introduction
Chapter 2 - Site Characteristics
                       2.1 - General Description of Soils
                       2.2 - Geologic Conditions
                       2.3Extraction of Mineral Resources
                       2.4 -  Topographic Features
                       2.5 -  Hydrologic Conditions
 

Chapter 3 - Inventory and Assessment of Existing Facilities

                        3.1 - Buildings and Sites

                        3.2  -   Infrastructure

                                    3.2.1 - Sewer System

                                    3.2.2 - Water Service

                         3.3 Utilities

3.3.1 - Electric Service

3.3.2 - Telephone Service

3.3.3 - Natural Gas Service

3.4 - Solid Waste

3.5 - Data Connectivity

                        3.6 Lighting

3.7 Signage

3.8 Stormwater Management

3.9 - Landscaping

3.9.1 - Adopt-A-Bed Program

3.9.2 - Memorial Sites

3.9.3 - General Landscaping Areas

3.10 - Transportation Network

                                    3.10.1 - On-site Vehicle and Pedestrian Network

3.10.2 - Adjacent County and Local Road Network

  3.11 - Emergency Management Services

3.12 - Neighborhood Quality of Life

Chapter 4 - Future Development

4.1 - Natural Development Constraints

             4.1.1 - General Building Site Conditions

             4.1.2 - Permeability and Erodibility

               4.1.3 - Hydric Soils

4.2 - Potential Sites for Future Development

4.3 - Potential Development Scenarios Based on Identified Needs

4.4 - Transportation Network

  4.4.1 - Improvements Already Designed & Anticipated for 2002-2003

  4.4.2 - Adjacent County and Local Road Network

  4.4.3 - Additional Options for Improving County Complex Dr

4.5 - Emergency Management Services

4.6 - Neighborhood Quality of Life

4.7 - Landscaping

                        4.8 - Utilities
                          4.9 - Stormwater Management
                        4.10 - Capital Improvement Planning Process

Chapter 5 - Recommendations

5.1 - Buildings and Sites

  5.1.1 - General and Preventive Maintenance

  5.1.2 - Capital Improvements

5.2  - Infrastructure

  5.2.1 - Sewer System

  5.2.2 - Water System

5.3 - Utilities

  5.3.1 - Electric Service

  5.3.2 - Telephone Services

5.4 - Solid Waste

5.5 - Data Connectivity

5.6 - Lighting

5.7 - Signage

5.6 - Stormwater Management

5.7 - Landscaping

5.10 - Transportation Network 

   5.10.1 - On-site Vehicle and Pedestrian Network

   5.10.2 - Adjacent County and Local Roads

5.11 - Emergency Management Services

  5.12 - Neighborhood Quality of Life

5.13 - Recommendations for Future Development

Chapter 6 - Implementation Strategy

List of Maps
                        Map 2-1 - General Soils Map

            Map 2-2 - General Topographic Features 

            Map 3-1 - Existing Conditions Site Plan

              Map 3-2 - Existing Sanitary & Stormwater Sewers

            Map 3-3 - Existing Public Water Services

              Map 3-4 - Existing Electric Service

            Map 3-5 - Existing Telephone & Data Connections

              Map 3-6 - Existing Natural Gas Service

            Map 3-7 - Existing Traffic Circulation & Areas of Conflict

            Map 3-8 - Free-Standing Sign Inventory

            Map 3-9 - Stormwater Management:  Existing Subwatersheds

              Map 3-10 - Existing Landscaping & Buffering

           Map 4-1 - Soil Types & Development Limitations

            Map 4-2 - Soil Characteristics:  Permeability

              Map 4-3 - Soil Characteristics:  Erodibility

            Map 4-4 - Soil Characteristics:  Hydric Soils

              Map 4-5 - Future Development Scenarios

                          Map 4-6 - Future Utility Expansions
Appendices 

                         Appendix A -Building & Site Inventory

                         **Appendix B - Stormwater Management Run-Off Potential 

                         **Appendix C - Ontario County Capital Improvement Plan: 2002-2007
** Not Avalible in On-Line Version Contact Planning Department for Copies
  Download a complete version of the plan for easy printing (pdf2.5 meg)            
 

Page Last Updated On: Monday, November 07, 2011